Breakspear Road South – more work

From HS2:

From 26 May 2021, we will be carrying out enabling works at Breakspear Road South.

These works will help us to prepare the area for the temporary footpath diversion and the pedestrian bridge over the River Pinn. We will remove brambles and create a ditch to protect the area from potential flooding.