Two chances to tackle HS2

HS2 is holding two ‘information-sharing events’ for Ickenham residents in October and November.

Here’s a summary:

HS2 has been trying to identify ways of reducing HGV traffic movements in the West Ruislip and Ickenham area, in particular, the peak two-way HGV movements from 1060 to a maximum of 550 per day at Swakeleys Roundabout.

Its report sets out its proposals, plus ways to significantly reduce sustainable placement of surplus excavated materials on land between Harvil Road and Breakspear Road South.

If you want to preview what it will be presenting, the summary report is at:  www.gov.uk/government/publications/hillingdon-traffic-study-summary-report

The invites are very similar, click on one to download it:

13th October 3-9pm St Giles

3rd November 3-9pm Village Hall

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s