Harvil Road bridge closure 9-17 March

Harvil Road planned works on the bridge over the railway 9th to 17th March:
 
Description: Breaking down displaced brickwork at the parapet of the railway bridge and re-building. Working times 07:00 – 19:00.
 
Road closure to be continuous for the duration of the works.
 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.