HS2 and its (lack of) information

An intrepid team member visited the HS2 event on September 22. Its pre-event billing promised this: See visualisations of the portal structure.

Somewhat underwhelmed, our colleague got a copy of the display boards (download the pdf – 1MB)

Anyone who was expecting to learn details, among other things, of construction noise, operational noise, how the two tunnels will be bored, how construction segments will be brought to site and where they will be stored, how the spoil will be removed, the conveyor belts, the design and visual impact of the entrance, would have been disappointed.

Furthermore, most people’s idea of a visualisation of a tunnel portal would be similar to these….

…. which came as a surprise to HS2 staff.

A footnote from me:

Looking at the main document, I was surprised to see trees in bloom in January:

Even if you use the American date format (why would you?) the picture is still misleading.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.