BRS closures 1-16 April 23

Breakspear Road South – Easter School Holidays Road Closure Sat 01/04 AM to Sun 16/04 PM

LBH have agreed to a Network Rail request to close Breakspear Road South while they undertake essential repairs to the Chiltern Bridge. In an effort to maximise the Road Closure LBH Officers have consented to collaborative works that will involve Network Rail and HS2/SCS carrying out multiple activities during this road closure.

Activities:

Network Rail:
– Repair of Bridge
– Examination of Structure & De-vegetation works on Network Rail Asset
HS2/SCS:
– Installation of Signage and White Lining for Chiltern Line Bridge Mitigations
– Installation of Utilities Trench for the connection for the TBM water supply
– Concrete pour for HS2 Bridge Deck
– Patch Repairs to Pot Holes around Chiltern Bridge area to HS2 Site entrance
– Repair of x2 Gullies south of Chiltern Bridge
– De-vegetation works in area

The Road Closure will be either side of the Chiltern Bridge with the Diversion Route along Swakeleys Road, Ickenham High Road, Ruislip High Street, Bury Street and Breakspear Road (or vice versa).