Latest HS2 updates

Next Week
Breakspear Road South junction Fine Bush Lane 3-Way Traffic Lights
(Mon 28/10 to Sat 02/11 – Daytime only 8am to 6pm) 
These works have been agreed by LBH with the new dates coinciding with the School Half-Term w/c Mon 28/10 until Sat 02/11 – full details below:  3-Way Traffic Lights by junction of Breakspear Road South & Fine Bush Lane  LBH consent to these works taking place during the next School Half-Term from Mon 28/10 to Sat 02/11 Traffic Management during the day on Breakspear Road South (8am to 6pm only).   HS2/SCS to carry out works to clear the existing Culvert and connect the HDPE pipe into the Culvert, which HS2/SCS would like to complete before Winter arrives. This is part of the permanent drainage for the Northern Sustainable Placement Area (NSPA) located in the fields between Newyears Green Lane and Breakspear Rd South.
 3-Way Traffic Lights which would be operational during the day (Core Hours 8am to 6pm) so the Traffic Management will be pushed to the side of the road outside of these hours to allow increased traffic flow.

Future Planned Works:  
New Harvil Road at New Chiltern Line Bridge – Night Time Road Closures over 4 Saturday Nights 23/11, 30/11, 07/12 & 14/12 (9pm to 6am)  
HS2/SCS have requested 4 Night time Road Closures on Harvil Road (between 9pm to 6am) on 4 consecutive Saturday Nights from Sat 23/11 until Sat 14/12. These works are to survey the Butt Welds underneath and on top of the new Chiltern Line Bridge over Harvil Road. 
The work can only be done on a Saturday Night due to limited Railway Possessions being available and over 4 Saturday Night Shifts as there are a lot of Welds that must be checked.
Dates:  23/11/24 – 24/11/24 (9pm until 6am)       30/11/24 – 01/12/24 (9pm until 6am) 07/12/24 – 08/12/24 (9pm until 6am)       14/12/24 – 15/12/24 (9pm until 6am)
The Road Closure would mean a Diversion along the A40. A full Road Closure is required due to the width of the Crane that will be used to inspect the Bridge        
New Dates
Road Closure of Skip Lane for Surveys of Utilities & Drainage –
10pm to 5am over 2 Phases between 30/11 and 04/12 (Phase 1) and 07/12 and 08/12 (Phase 2 Contingency Shift). 
HS2/SCS will be carrying out Surveys of the Utilities & Drainage on the section of road between Certas Oil Depot and the old Skip Lane junction (by the old Harvil Rd Bridge over the Chiltern Line).  
The Road will be Closed at Night between 10pm to 5am on the dates above.  
These works will not affect users of Harvil Road and will only impact the Businesses that use Skip Lane.