Breakspear Road South closures (Part 1 of 2)

HS2/SCS has requested a Lane Closure managed with 3-Way Traffic Lights (plus pedestrian crossings) within its normal Haul Road Traffic Lights setup on Breakspear Road South from Fri 25/07 at 5am until Mon 28/07 at 5am.  In theory the Lane Closure would require an additional Phase to be added to the current Traffic Management setup (which is the long-term Haul Road Crossing plus Pedestrian Phase in place since 2021). 
The Traffic Management setup for the works Fri 25/07 at 5am until Mon 28/07 at 5am is as follows
  Traffic Head – Northbound Traffic Head – Southbound Traffic Head  – HS2 Haul Road (on demand) Pedestrian Crossings (on demand)  
The works are to install a temporary Bellmouth Access between the new HS2 Bridge and the Chiltern Line Bridge next to the Southbound carriageway, which will be used to assist removing the Conveyor System, install Drainage and Landscaping on the Embankment next to the Chiltern Line.
 
The Bellmouth Access once installed and operational will be in place until around Sept 2026 with a maximum of 10-15 vehicles using this Access per day. Once operational there will be a re-phase of the Traffic Management in this location with an additional Traffic Head added to the Bellmouth to allow safe exit onto the Highway (which should be off set with fewer vehicle movements required going across the Haul Road Crossing).