The latest crop of new applications are in postcodes UB10 8… then AU, BB, DR, LS, LS, LW, QF, QH and SB. No appeals this week. Map link.
Category Archives: Resources
The Ultra Low Emission Zone is coming
Here are some extracts from TfL’s ULEZ pages:
To help improve air quality, an Ultra Low Emission Zone (ULEZ) will be in place in central London from 8 April 2019. Most vehicles including cars and vans will need to meet new, tighter exhaust emission standards (ULEZ standards) or pay a daily charge to travel within the area of the ULEZ.
Charges for cars (if ULEZ standards NOT met):
Daily charge – ULEZ (Low): £12.50
Penalty charge: £160 (reduced to £80 if paid within 14 days)From 25 October 2021, the ULEZ area will be expanded to include the inner London area bounded by the North and South Circular Roads.
Check your own car’s liability
Worth noting that the North and South Circular Roads are themselves outside the zone.
Planning updates 07-01-2019
The latest crop of new applications are in postcodes UB10 8… then AB, AN, DP, DR, EY, HG, HH, JY, LU, LW, NP, PT, QD, QF, SH and TF. Appeals in HE, QJ, TE and TL. Map link.
Appeals update 06-01-2019
I thought it was time I flushed out the rejected and accepted appeals. Map link.
Breakspear Road South lane closure Jan 7-16
HS2 in Hillingdon reports:
Work is required to complete the diversion of an Affinity water main. The nature of the work means that it can only be carried out under a northbound lane closure of Breakspear Road South.
The work will start on Monday 7 January and will last until Wednesday 16 January and will be working 24 hours a day, seven days a week.
Traffic management with temporary traffic lights will be put into place to allow traffic to continue to use the road during this time. Further information can be found here.
Planning updates 18-12-2018
This week’s crop of new applications are in postcodes UB10 8… DR, NP, NR and QH. Also note 9PQ – significant changes to the Master Brewer development. Comments must be in by January 7th. One appeal at UB10 8RA. Map link.
Planning updates 11-12-2018
This week’s crop of new applications are in postcodes UB10 8… then AL, AT, AX, DG, DL, EU, FJ, HU, LW, QG and RA. Map link.
More Breakspear Road South closures
Following recent meetings with HS2, we have been advised that HS2 contractors will need to close the northbound lane in Breakspear Road South for a 30-metre stretch north of the Chiltern line bridge. This is planned to last nine days – Jan 7 to 16th. This will be followed by an eight-week complete closure commencing last week of February. These dates are to be confirmed.
Planning updates 03-12-2018
This week’s crop of new applications are in postcodesUB10 8… then DN and LW. Map link.
Planning updates 19-11-2018
This week’s crop of new applications are in postcodes UB10 8… then AU, DL, ES, LX, NQ, PP and QS. New appeals at LU and HB. Map link.