HS2 Christmas break (sort of)

You will be pleased to hear that we have been advised by HS2 that SCS will shut down works in Hillingdon from 3pm on the 24 December until the morning of the 4 January 2021.

The only exception will be a delivery of diesel, and one small pump through at West Ruislip on either 29 or 30 December. These will involve one or two vehicles and a small number of operatives.

Other than that the only staff on site throughout the whole of the period will be the security personnel.

Enjoy the respite!

Paper Winter Newsletter Available

If you know Ickenham villagers without internet access, they might be interested to hear that a small number of printed copies will be available in the village from Monday as follows:
Maison du Soleil
St Giles Porch
Ickenham Library, and
Dalton’s egg van next Sat 12th

We are hopeful that by the time the next newsletter (due March 2020) is ready we will all be in a position to deliver it to our members.

Winter Newsletter Available Online

You’ll find the Winter 2020 issue in the website archive.

(Normally, we add newsletters to the archive as soon as the next one hits the streets. Unfortunately, due to COVID-19, the street-hitting still hasn’t started up.)

If you are not a member of the Residents’ Association, for a £2 per annum subscription, you can normally get the newsletters hot off the press. For no extra, and at your choice, the Association will keep you updated with more immediate news by email. If you are a member and don’t get the emails, drop a line to ickenhamresidents@hotmail.com

Santa Claus is coming to town!

You may well have seen this on the village Facebook pages but just in case you haven’t:

The Rotary Club announces

Santa’s coming!
Please donate generously to Santa and his amazing team
 
Socially-distanced Santa will be bringing his musical sleigh to Ickenham visiting: Gibson Road, Campden Road, Charlbury Road, Enstone Road, Malcolm Road, Woodstock Drive, Halford Road, Swakeleys Drive, Thornhill Road.
Because of COVID-19, we can’t collect door-to-door, but we are raising money for the London Air Ambulance and Coram Life Education (Hillingdon).
You can donate through: www.justgiving.com/fundraising/santahillingdon
Or text: SANTAHILLING to 70085 to donate £5 (texts cost £5, plus one standard rate message).
 
The schedule for Ickenham  is from 6:30pm as follows:
* Thursday 10th December – Ickenham
* Gibson Road (but not between Campden & Nettleton), Campden Road, Charlbury Road, Enstone Road, Malcolm Road (but not between Nettleton & Woodstock), Nettleton Road, Woodstock Drive (but not between Swakeleys & Gibson), Halford Road, Swakeleys Drive, Thornhill Road (between Woodstock & Gibson).
* Friday 11th December – Ickenham
* Lawrence Drive (but not between Crosier & St Giles), Crosier Rd, Glebe Ave (but not between Long Lane & Crosier), St. Giles Ave, Austins Lane (between St Giles & Glebe), Sussex Rd (between Glebe & Burnham). Tavistock Rd, Burnham Ave (but not between Glebe & Milverton), Milverton Drive, Edinburgh Drive, The Paddock, Long Lane.
* Monday14th December – Ickenham
* Greenacres Ave (between Derwent & St Georges), St Georges Drive, Copthall Road West (between St Georges & Derwent), Derwent Ave, Wallasey Cres, Hoylake Cres, Woodland Close, Eleanor Grove, Rectory Way, Swakeleys Road (between Rectory Way & Derwent).

Breakspear Road South closures from LBH

Notification from LBH:
 
I would like to take this opportunity to bring to your attention that Highways will be undertaking major emergency highway improvement works to Breakspear Road South Between its junction with Breakspear Road and the HS2 site entrance.

The works will involve carriageway resurfacing between Breakspear Road and the HS2 site entrance, clearing the ditch line on both sides of the carriageway, and renewing sections of kerb line.

HS2 is currently working in Breakspear Road South under a two way temporary traffic light control system with scheduled full road closures between now and the 13th December 2020 to construct two new access crossovers and carriageway strengthening.

Given the sheer decline of the carriageway and the fact that HS2 is currently working in Breakspear Road South under a temporary traffic light control system with scheduled closures between now and the 13th December 2020, Highways will take full advantage of this time to undertake these essential highway improvements in a collaborative venture with HS2 to minimise future disruption.

This will mean that Highways will put in place a full closure of Breakspear Road South between its junction with Breakspear Road and Copthall Road West starting on Monday 30th November with an estimated completion date of the 13th December, however this may be sooner providing no unforeseen issues arise.

Access will be maintained for all residents with a clear signed diversion as follows:

Swakeleys Road, High Road Ickenham, Ickenham Road, High Street, Bury Street, Breakspear Road, and vice versa

Electronic VMS signs will be in place from 25th November advising motorists of these essential works.