If your regular collections are between 28 August and 1 September, they will happen a day later.
e.g. 28th August will be 29th
If your regular collections are between 28 August and 1 September, they will happen a day later.
e.g. 28th August will be 29th
| from our new SNT member Good morning all, I shall be holding a ‘Library Surgery’ at Ickenham Library on Monday 14th August between 2-3pm. Please pop down if you would like some crime prevention advice or have any concerns you’d like to share in regards to crime in your area. I’d be happy to assist you. Take care, If you need to reply regarding this message, tap on this email address: sntwa-ickenhamsouthharefield@met.police.uk Regards, Billie Leadbitter |
Looks like we missed a week. Last week’s planning applications, appeals and decisions. Click on the link or download the pdf. The pdf gives you direct links to the LBH planning and appeal search pages.
Recent planning applications, appeals and decisions. Click on the link or download the pdf. The pdf gives you direct links to the LBH planning and appeal search pages.
From RAF Northolt
An out-of-hours flight will take place on 14 Aug.
Thank you for all your understanding and patience.
from HS2
From 29 August to 1 September 2023, we will be carrying out works along Breakspear Road South, on the new HS2 bridge to remove the timber structure from the deck edge on both sides of the bridge.
To carry out the works safely, the road will be closed overnight from the Breakspear Arms to the Copthall Road West junction from 10pm to 6am.
A clearly signed diversion route will be in place via Swakeleys Road B467/ High Road B466/ Ickenham Road/ High Street/ Bury Street A4180/ Breakspear Road.
FROM HS2
Main Conveyor Update
The Main Conveyor which will carry the Spoil from the 2 Tunnel Boring Machines (TBMs) to the Treatment Area off Harvil Road has recently successfully completed testing, and the protective ‘shrouding’ metal covers have now been installed along the whole length of the Conveyor between West Ruislip and the Treatment Area off Harvil Road.
The Main Conveyor has now begun operating 24 hours a day, but at present the 24/7 running of the Main Conveyor is dependent on the amount of Material/Spoil generated by the TBMs, so in the short-term the 24/7 requirement might not be needed at all times.
The Conveyor will transport the Spoil from the TBMs over The River Pinn and Breakspear Road South, and then across the Chiltern Line into the Treatment Works off Harvil Road for distribution onto the Southern Sustainable Placement Area (SSPA).
This will also lead to the phasing out of use of the Temporary Conveyor over the next month which in turn should end the requirement of the moving of Materials via lorry from the TBMs to the storage areas within the HS2 Sites (which has been happening up to 24 hours a day over the past few months).
Breakspear Road South Night Time Closures 29/08 for 5 Nights
HS2/SCS have requested Night Time Road Closures of Breakspear Road South for 5 Nights from Tue 29/08 to carry out the removal of the Bridge Deck Edge Protection attached to both sides of the newly built HS2 Bridge. The Road will be closed each night from 10pm until 5am the following morning from the Chiltern Bridge to the HS2 Bridge. Details below:
Traffic Management:
Requested Dates:
Tue 29/08 at 10pm to Wed 30/08 at 5am
Wed 30/08 at 10pm to Thu 31/08 at 5am
Thu 31/08 at 10pm to Fri 01/09 at 5am
Fri 01/09 at 10pm to Sat 02/09 at 5am
Sat 02/09 at 10pm to Sun 03/09 at 5am
Activities:
| From new ward PC I would like this opportunity to introduce myself as your new PC for the ward. I have previously worked on Hillingdon East and look forward to joining the team. I shall be holding a meet at Costa coffee in Ickenham on Thursday 10th August between 1-2pm. Please pop down to say hi or if you would like to raise any concerns regarding crime in your area or seek crime prevention advice. I’ll be happy to assist you. PC Billie Leadbitter 1257WA |
Recent planning applications, appeals and decisions. Click on the link or download the pdf. The pdf gives you direct links to the LBH planning and appeal search pages.
from our RAF Northolt contact
There will be a number of ‘out of hours’ helicopter movements at RAF Northolt on 26th July. This will be in support of Defence taskings and should be complete by 22:30