HS2 updates

From HS2:

HS2 and our contractors SCSJV will be holding an online information event on Thursday 29 July from 3pm to 5pm to share our designs of the Copthall Tunnel, between Breakspear Road South and Harvil Road, as well as the Northern Sustainable Placement Areas, located off Newyears Green Lane.

Join us to find out about:

  • Tunnel designs
  • Landscaping
  • Upcoming works programme
  • Construction methods

You will be able to hear from our team of experts and ask questions.

This event is being held on:

Thursday 29 July from 3pm to 5pm

You can register for the event via this link. https://www.eventbrite.co.uk/e/copthall-tunnel-and-northern-sustainable-placement-areas-update-tickets-163352304139
Please note registration closes 2 hours
before each live event starts.

We will be running this session via Microsoft Teams , which is a free to use online platform. If you have the Microsoft Teams app installed on your desktop or mobile device, the session will open automatically within that.

Further joining instructions will be sent to all registered attendees closer to the time.

We are holding virtual one to one sessions to learn more about HS2 works in Hillingdon and Northolt. HS2 and their contractors would like to invite you to book an appointment for a virtual one-to-one session. The sessions are a chance to learn more about works in the Hillingdon and Northolt areas. The 15-minute appointments are available on: • Monday 2 August, 3pm to 7pm When registering, please specify your area of interest and postcode. Topics available include: . Works in your area . Highways and traffic . Noise and vibration . Utility works . Community engagement . Other (please let us know if you have other queries) You can book a slot on the HS2 website, please click here   https://www.eventbrite.co.uk/e/one-to-one-virtual-events-hs2-works-in-hillingdon-and-northolt-tickets-161880144871

Colne Valley Park Festival Fortnight

We have been asked to circulate this to you:

We are delighted to share with you our Colne Valley Park Festival Fortnight details, which has an exciting programme of events and activities for everyone to enjoy across the whole Colne Valley. Please do share this post, as we would be thrilled for as many people to enjoy what is on offer as possible.

From Batchworth to Staines, Langley to Uxbridge, we are partnering with volunteer groups, organisations and charities to offer you a variety of guided walks, online talks, children’s activities and more for you to enjoy over the Festival Fortnight: Saturday July 24th to Sunday August 8th 2021

Follow our link: https://www.colnevalleypark.org.uk/colne-valley-festival-fortnight-2021/

To find out more, book on the events and get ready to explore, enjoy and discover the Colne Valley Park!


West Ruislip concrete breaking trials

From HS2:

At the West Ruislip site, we will be carrying out a 5-day trial of a machine that breaks down concrete into smaller reusable parts.

If this trial is successful, it will mean that the number of lorry movements required to transport concrete to and from site will be reduced and will remove a significant number of lorries from local roads.
for map and more info

https://www.hs2.org.uk/work-items/notice-of-equipment-trial-at-west-ruislip-site/

U46 Footpath Diversion

from HS2

The U46 footpath diversion

We are progressing to a stage in our works where we will be diverting a number of footpaths. These works will facilitate the completion of the internal haul road and help to keep as many vehicles off local roads as possible. Our first diversion is the U46 footpath, the short footpath that runs from the Celandine Way to Breakspear Road South near Oak Farm. The surface of U43 has been improved and extended and it currently progresses south behind the trees and emerges at a marked crossing point in Breakspear Road South. Please see map on link below.

https://www.hs2.org.uk/work-items/notice-of-the-u46-footpath-diversion/

September URC Jumble Sale

From URC:

We were overwhelmed by the response to our July sale, which raised over £590 despite only featuring plants and the quality books and the weather being rather Wimbledon.  It was lovely to see so many old friends again after a long gap and they seemed really happy to be back.  So, we’re going to do it again on Saturday 4th September [10am to 12 Noon, admission free] with a coffee morning and plant stall, lots more books [and stamps and postcards] plus bric-a-brac and toys and games.  If you have things to donate please bring them to the church on Friday 3rd September between 3pm and 7pm or ring Richard Piper on 01895 634348 for collection.  We could also do with some more helpers to join our happy team so if you think you could spare an hour or two please ring the same number for details.  Whether helping or visiting you will be supporting a range of worthwhile charities as well as the work of our church

Richard Piper

Ickenham Road and High Road works 6 to 20 July 2021

From HS2

Work item details

What we are doing
From 6 to 20 July 2021, we will be carrying out ground investigation along Ickenham Road and High Road near the West Ruislip train station, in the area shown on the map link below. This will help to inform our design decisions in the area. The ground investigation will involve the use of scanning equipment to identify utilities in the area. We will be excavating trial holes to take measurements and ground samples.

How the surveys might affect you
Due to the location of the utility surveys, footpath diversion will be in place and the cycle path will be closed for the duration of these activities. This is to ensure that the surveys can be carried out safely.
There will be no disruption to your utility services.

For map etc:

https://www.hs2.org.uk/work-items/notice-of-utility-investigations-near-west-ruislip-train-station/

Breakspear Road South closure

from HS2

We have been informed that the London Borough of Hillingdon will have a full road closure at Breakspear Road South on Monday 14 June 2021, for one week to carry out resurfacing works from the south of the Chiltern Line bridge to Swakeleys junction.

As a result of these works, the SCS site team at Breakspear Road South have cancelled their works planned for next week. (Notice of works for the U46 footpath road crossing HS2-EW-SCS-Ph1-Ar-So-S1-Traf-33-14/06/2021)

Newyears Green Lane & West Ruislip works

from HS2

Newyears Green Lane
We wrote to you recently to advise you that we would be carrying out ecological surveys on 17 May and 1 June along Newyears Green Lane. Due to poor weather conditions, we were unable to complete the surveys. We therefore require additional time to complete these works, which will now be completed on 1 and 14 June 2021. A road closure will be required between 8pm and 5am to ensure these works can be carried out safely.

West Ruislip
We will be carrying out works over one weekend (19 & 20 June 2021) in the bell mouth where vehicles access the site from Ickenham High Road. We are connecting a foul sewer from site to a chamber that sits underneath the centre of the junction.

Once connected the trench will be backfilled and the work area reinstated. We will carry out the main cut into the concrete within normal working hours on the Friday 18 June, to minimise noise on the weekend

Duration of works
The weekend of 19 and 20 June 2021
From 8am to 6pm

What to expect
An excavator and dumper trucks will be required to create the trench for the sewer

What we will do
Maintain access along the footpath and carriageway of Ickenham High Road