Response to “Cancel HS2” petition

The Government has responded to the ‘Cancel HS2 immediately and repeal the 2013 and 2017 High Speed Rail Acts’ petition, which runs until March 21 2018. It promises that, “At 100,000 signatures, this petition will be considered for debate in Parliament.” (My italics.) Right now, 16,958 people have signed the petition.

Here’s the official response:

HS2 will provide new rail network capacity, drive economic growth, create jobs and investment, train the next generation of engineers and better connect our major cities. It is on time and on budget.

New Railway

HS2 will form the new backbone of our national rail network, providing new capacity and better connecting our major cities, while creating more space for commuter and freight trains on our busiest lines. This will create better connections and more seats for passengers and allow more goods to be moved by rail, which will also help to improve air quality.

Opening in 2026, the HS2 network will serve towns and cities including London, Birmingham, Manchester, Leeds, Liverpool, Sheffield, Crewe, Nottingham, Derby, York and Newcastle, with trains running on to Scotland. By 2033 up to 18 trains an hour will run in both directions, carrying up to 1,100 passengers each.

HS2 is a major investment but an essential one. HS2’s total budget is £55.7bn. Over the current Spending Review period spending on HS2 will equate to 0.14% of GDP. We are keeping a tough grip on costs and are determined to deliver HS2 on time and on budget.

Benefits to the North

We are delivering unprecedented investment in infrastructure in the North, to redress the historic imbalance in infrastructure investment between north and south. The Northern Powerhouse is a key priority, and our substantial investment will boost the northern economy and reduce the prosperity gap with the South that has existed for far too long.

We are also working to future-proof HS2 by including provisions for new junctions in the North and Midlands, which will help ensure that the infrastructure can accommodate the Northern powerhouse. HS2 will transform capacity and connectivity for millions of people across the north. With HS2 stations in Manchester, Leeds, Crewe and Sheffield, the north will be the principal beneficiary of HS2.

HS2 will underpin the plans of local areas to grow their economies, in places like Leeds where the South Bank regeneration project around Leeds station is expected to support 35,000 jobs across key sectors and 4,000 new homes. HS2 will generate around £25 billion of contracts and represents a major opportunity for businesses across the whole of the UK including small and medium-sized enterprises.

The Government has committed £60m to take HS3, or Northern Powerhouse Rail, forward and we are working closely with Transport for the North to develop a business case for the project by the end of 2018. The Government is investing over £13bn in the north of England’s transport infrastructure, including on roads and railways, to deliver faster journeys and increased capacity. That work will continue apace and is a key priority for the Department.

This includes dramatically improving journeys for passengers across the north with the Great North Rail Project. By 2020, as a result of this ambitious and comprehensive upgrade, passengers will benefit from faster and more comfortable journeys, as well as new direct services across the north and beyond. We are also developing options for the Transpennine Route Upgrade, to increase the number of seats, and reduce journey times, allowing journeys such as from Leeds to Manchester in 40 minutes.

HS2 is key to the future of our transport system and the relationship it has with our existing network is a vital part of our planning. It is not a case of “either/or” but rather one of joined up and complementary delivery. Over £38 billion is being spent on improving the existing rail network for the five years between 2014 and 2019. This investment is funding projects to increase capacity on the existing rail network and improve journeys for all passengers. There is also potential for HS2 to increase the amount of freight transported by rail – meaning fewer cars and lorries on our roads, cutting congestion and carbon.

Creating Jobs and skills

HS2 will support growth in the wider economy, worth an additional 100,000 jobs. 70% of all jobs created by HS2 will be outside of London. But this isn’t just about when the new railway opens – jobs and skills are being created now.

Several contracts have already been let and major contracts for up to £11.8 billion worth for the civil engineering work will be let this year. HS2 is working with businesses across the UK – including many small and medium-sized firms – to ensure they are well prepared to bid for work on HS2. HS2 will generate around 25,000 jobs during construction as well as 2,000 apprenticeships.

And HS2 is about upskilling: a more skilled workforce is vital for the country as we forge a bold new positive role for ourselves in the world. The National College for High Speed Rail, based in Doncaster and Birmingham, will open its doors later this month. The College will train young people to build HS2 and other world-leading rail projects.

Department for Transport

Click this link to view the response online:

https://petition.parliament.uk/petitions/200793?reveal_response=yes

The Petitions Committee will take a look at this petition and its response. They can press the government for action and gather evidence. If this petition reaches 100,000 signatures, the Committee will consider it for a debate.

The Committee is made up of 11 MPs, from political parties in government and in opposition. It is entirely independent of the Government. Find out more about the Committee: https://petition.parliament.uk/help#petitions-committee

Thanks,
The Petitions team
UK Government and Parliament

 

 

 

The Harvil Road protest against HS2

The Green Party and fellow activists are protesting about HS2 ripping out trees in Harefield. Five of them have spent the night under a digger, to prevent further damage and an eventual environmental catastrophe for Harefield and surrounding areas.

While the Ickenham Residents’ Association avoids political positioning, we feel that this ongoing story may interest many of our members. To keep track of what’s going on please check in with Get West London.

Giant Jumblie coming your way…

Giant Jumblie at the URC!

The URC is holding its Autumn Jumble Sale on Saturday 7th October from 10am to 12 noon, admission 50p.  Come along for lots of bargains and if you have items to donate please bring them to the church between 3pm and 7pm on Friday 6th October or phone Richard Piper on 01895 634348 for collection.

Boring locations (HS2 holes, that is)

Apologies for lack of detail but this is the area to the north of The Greenway and Hoylake Crescent. Each blob appears to be a bore hole as described in the previous news update. If I get more information, I’ll add it to this post.

[ 22 Sep ]

Here are the symbols and legends (you can now click on the map above to see a larger version):

Ground Investigation Surveys: Ruislip Golf Course

This just in from HS2:

Ground Investigation Surveys

What are we doing?
As part of developing the route design of the HS2 high speed railway, we are carrying out ground investigation (GI) surveys on Ruislip Golf Course starting from week beginning 2 October 2017 until 17 November 2017.

The work will take place week days only between 8am and 6pm. lt will involve using drilling equipment to take samples or measurements of soil and water conditions. This type of survey helps us to understand more about the ground where we want to build the railway. lt’s vital that we know about the soil before construction begins so we can build effectively.

If you’d like to know more, please visit www.gov.uk/hs2 and download our non-
technical ground investigation guide.

How will this affect me?
There are different types of GI taking place.

  • There will be ten rotary core boreholes being drilled at a depth of between 35m and 40m using large vertical drilling equipment with each borehole taking between 7 to 10 working days.
  • There will be five cable percussion boreholes drilled to a depth of between 10m and 20m taking around 10 working days in total.
  • There will be five cone penetration tests taking place that is non- intrusive taking 3 days in total.
  • There will be some trial pits and pavement core samples taken in the car park and access road.

Our contractor will work as quickly as they can, avoid unnecessary noise and keep the area tidy. Once the work is complete our contractor will restore the area to its previous condition. We apologise in advance for any inconvenience that this may cause.

Site preparation
ln advance of drilling we will be undertaking site preparation involving track laying the week beginning 25 September.

Duraton of works

Weekday working hours
Working hours between 8am and 6pm Our contractors may also be on site for one hour‘s start-up and shutdown.

What to expect

  • Background noise from drilling boreholes and digging trial pits and the use of water pumps
  • Hoarding around the site
  • Contractor vehicle movements to and from site.

What we will do

  • lnform you in advance of any changes to the dates shown
  • Keep all sites safe and secure
  • Ensure that all sites are reinstated to the required standard

For more information contact our helpline (available 24/7) on 08081 434434 or email hs2enquiries@hs2.org.uk. Visit our website at www.gov.uklhs2

High Speed Two (HS2) Limited
Two Snowhill, Snow Hill Queensway, Birmingham B4 6GA